Quality Inspection for Full Spring Steel Cable Puller to Oman Factory

We always continually provide you with the most conscientious customer service, and the widest variety of designs and styles with finest materials. These efforts include the availability of customized designs with speed and dispatch for Quality Inspection for Full Spring Steel Cable Puller to Oman Factory, Standing still today and looking into the future, we sincerely welcome customers all over the world to cooperate with us.


Full Spring Steel Cable Puller

 

Specification

Product name :  Full Spring Steel Cable Puller
Material: Spring Steel Wire
Usage: Pull the wire through the wall or tube, save time and labor, easy and long lasting
Length: 15M-30M-45M-60M or custom length
Thickness: 3.2mm/3.8mm diameter.

 

Advantages

1. The work ability of our product is excellent.

2. The product is also available to the work inserting a wire into a crooked place due to high bending elasticity.

3. The product uses non-conductive plastic materials, so there is no risk of electric shock.

4. The product can be used for an extended period of time

5. It does not get rusty and corrode.

6.It shortens working time remarkably in the street with many curves and long distance.

7. The price is cheap when compared with the quality.

 

Product Description

Detail Photos

Full spring cable puller  (1) Full spring cable puller  (4) Full spring cable puller  (5 Full spring cable puller  (6)

 

 

Other Fish Tapes

fish tape

  • Previous:
  • Next:
    • Others

      Should you need any product or have any question, please do not be hesitate to contact with us.

    • Shipping

      Shipment: All goods can be delivered by Sea and By air or according to your request. Loading Port: Ningbo or Shanghai, China

    • Payment Terms

      Payment terms: TT: 30% deposit and left pay after receive the copy of BL within 7 days

    • Delivery Time

      Sample lead time: about 1-2 days Mass production lead time: about 25 days after getting the deposit




  • Robi goes on the blink during the eve of an all-important mansion housewarming party, forcing Scooby and Shaggy to replace him with a new robot butler. Little do they know, the new “ro-butler” is actually a terminator-like annihilator-bot built by Dr. Phineus Phibes. After Scooby and Shaggy repeatedly frustrate the robot, Dr. Phibes gives the order for a full-on assault. By using a Scooby Snack that gives Scooby transforming battle-bot capabilities — and with the help of Robi, who has been sequestered in a closet– Scooby and Shaggy fight back. In the end, they save themselves from being expelled from the neighborhood; manage to make Mr. Havansimp, the President of the housing association, a foot taller; and, in the meantime, throw the best party in history.

    TOP